Responsibilities of operating personnel Taco 007 pump are determined by job description. In accordance with the schedules, instructions and operational personnel manager should provide the most economical and reliable mode of plant equipment. Fully automated Circulator pumps, operating without duty personnel, and the station operated from the control room, serviced by:
- For PEX Plumbing systematically and sewage plants with capacity up to 25 thousand m3/day. – Duty fitters and electricians;
- In enterprises with capacity from 25 to 150 m3/day. – On duty for the electromechanical workshop;
- In enterprises with productivity more than 150 thousand m3/day. – Specially selected electrical engineering and mechanics.
Staff has automated Circulator pumps, required at least 1 times a day to check the work station equipment, noting each time your visit and noticed flaws in the journal. Start and stop the automated units Taco 007 pump carried out tower, where there is a scoreboard with an indication of parameters of all units of the station. Change modes of automated stations are allowed only in emergency cases.
With a fully automated Taco 006 data units recorded on the recording equipment. In addition, the staff that produces periodic inspection and maintenance station, during his visits to record in the statement of information about the parameters of operating machinery and other equipment of the station.